CORTEX manages the process of type-approving new network elements or device firmware, ensuring that any new additions to the network infrastructure are thoroughly evaluated and integrated. It efficiently orchestrates the entire process, from installing new firmware versions onto lab equipment to the comprehensive installation and commissioning of new lab equipment. This process is critical in assessing the compatibility and performance of new network elements or firmware within the existing network infrastructure.
The functionality of CORTEX extends to managing the hands-on tasks involved in the type approval process. It oversees the installation of new firmware, ensuring that lab equipment is up-to-date and capable of accurately simulating real-world network conditions. CORTEX coordinates the commissioning activities of this lab equipment, which includes setting up and calibrating the equipment to meet specific testing criteria. This preparation is essential for conducting effective and reliable tests on the new network elements or firmware.
CORTEX maintains a high level of communication with all relevant stakeholders throughout the type approval process. It issues progress notifications at key stages, both to internal teams and external partners or stakeholders. These updates ensure that everyone involved is informed about the progress of the type approval activities, any challenges encountered, and milestones achieved.
A comprehensive type approval process is essential before selecting or authorising the installation of any new equipment in a network. This process is partly guided by regulatory requirements, ensuring the equipment meets industry standards and legal stipulations. However, from a Service Assurance perspective, additional critical factors must be considered. Verifying the equipment’s compatibility with existing fault detection and alarm systems is paramount. This involves ensuring that any potential faults or alarms the equipment might generate can be effectively detected and appropriately responded to by the network’s monitoring systems.
In many cases, the responses to these alarms or faults can align with the protocols established for similar equipment types. However, there are instances where new and specific responses might be required. This could involve developing unique commands to extract more detailed data from the equipment or implementing specialised configurations in the network setup to accommodate the new hardware. Such tailored responses are necessary to ensure that the network continues to operate efficiently and reliably, even as new types of equipment are integrated.
This process of type approval, coupled with the development of effective response strategies, is crucial in maintaining the integrity and performance of the network. It ensures that new equipment meets regulatory requirements and fits seamlessly into the existing network infrastructure, enhancing overall service assurance.
You can also use our search facility to find the resources like this, business cases, case studies, news and whitepapers. Whatever content you are after, if you cant find it here, contact us and we may have it locked away somewhere.
/ Search here /
We’d love to hear from you.
Please fill out the form or send us an email.
+44 23 8254 8990
Mon–Fri from 9am to 5pm
(GMT)
+44 23 8254 8990
Mon–Fri from 9am to 5pm
(GMT)
22 Kings Park Road
Southampton
SO15 2AT